Funding entity Endesa Distribución
The aim of this project is the determination of the maximum wind power generation in Tenerife. The maximum wind power generation is limited by both the steady-state and the dynamic performance of the power system. The project will also evaluate the sensitivity of the maximum wind power generation with respect to operating criteria of the power system. Scenarios corresponding to 2005 and 2008 will be considered.
MaximaEolicaTenerifeEndesa